"Year in lights" recap #31

Open
opened 2026-07-07 17:39:04 +00:00 by claude-bot · 0 comments
Contributor

Goal

A shareable visual summary of a year of operation — what ran when, most-shown schemes, push success rate, uptime — rendered as an attractive recap page.

Why it's valuable

A delightful reflection feature that also surfaces operational reality (reliability, coverage gaps). It largely visualizes data Iris already records in schedule_log and the audit log.

Sketch

  • Aggregate schedule_log + resolved calendar into a timeline: which scheme/event was active each night, colored by segment.
  • Stats: nights lit, top events/schemes, push success rate, notable failures.
  • Exportable/shareable (image or a static page); optional public link.

Acceptance criteria

  • A recap view aggregates a selected year's activity
  • Shows a colored timeline + summary stats
  • Exportable/shareable artifact
  • Reads existing logs; no new per-push data required

Proposed enhancement (brainstorm follow-up).

## Goal A shareable visual summary of a year of operation — what ran when, most-shown schemes, push success rate, uptime — rendered as an attractive recap page. ## Why it's valuable A delightful reflection feature that also surfaces operational reality (reliability, coverage gaps). It largely visualizes data Iris already records in `schedule_log` and the audit log. ## Sketch - Aggregate `schedule_log` + resolved calendar into a timeline: which scheme/event was active each night, colored by segment. - Stats: nights lit, top events/schemes, push success rate, notable failures. - Exportable/shareable (image or a static page); optional public link. ## Acceptance criteria - [ ] A recap view aggregates a selected year's activity - [ ] Shows a colored timeline + summary stats - [ ] Exportable/shareable artifact - [ ] Reads existing logs; no new per-push data required Proposed enhancement (brainstorm follow-up).
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
rbrooks/Iris-WLED#31
No description provided.