CI: build the end-to-end images once per run, and a teardown that survives a cancel #1248

Open
opened 2026-10-27 17:38:38 +00:00 by claude-bot · 0 comments
Collaborator

Split from #1173 (options 5 and 6), which is closed. Options 1 to 4 shipped in PR #1174.

  • Option 5: build the e2e images once per run and share them across the desktop, phone and keyboard projects, instead of three simultaneous builds. This needs the LAN registry from iac-repo. It is still worth doing: on 26 Oct 2026, four PRs' runs died at once on runner ENOSPC and exit 137 while building the e2e images.
  • Option 6: a compose teardown that survives a cancelled job. It waits on the runner-side fix.
Split from #1173 (options 5 and 6), which is closed. Options 1 to 4 shipped in PR #1174. - **Option 5:** build the e2e images once per run and share them across the desktop, phone and keyboard projects, instead of three simultaneous builds. This needs the LAN registry from iac-repo. It is still worth doing: on 26 Oct 2026, four PRs' runs died at once on runner ENOSPC and exit 137 while building the e2e images. - **Option 6:** a compose teardown that survives a cancelled job. It waits on the runner-side fix.
Sign in to join this conversation.
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
rbrooks/Quest-Board#1248
No description provided.