Lane 5: D41 adopted, and the 68 features it had dropped (#659) #695

Closed
claude-bot wants to merge 0 commits from feat/lane5-coverage into main
Collaborator

Part of #659, following the owner's review of lane 5.

D41 adopted

The planning page becomes PREP-4, "Planning, for the whole campaign", with IS-346 to IS-354. It has its own place in the Contents.

The coverage check

The owner asked whether every feature made it onto the page. Every row the catalogue places on PREP-1 to PREP-3 was classified against the page by a script that asserts none is skipped:

Status Placements
Drawn 86
Replaced by a decision, replacement drawn 39
Behaviour, nothing to draw 9
Another lane's surface 6
Deferred (speculative) 2
Dropped without a word 68

Total: 211 placements.

All 68 are drawn now:

  • Tools with their results: read-aloud, random tables, loot parcels, voice cues and the arc suggester.
  • Where a result goes: Save to the wiki, Append to an article (as a draft to review), and Copy.
  • Foundry: the split button and its push states.
  • Busy, failed and empty states: for the plan, the tools, the page and history.
  • Arcs: editing and deleting them.
  • Suggest a title: the first-of-series state. The first draw showed suggestions for Session 14, which is the first of its series and so has nothing to suggest from.

Rows re-homed so they aren't dropped twice

  • The Arc Board rows move to PREP-4, where the arcs now live.
  • Seven quest-tracker rows were placed only on PREP-2. Moving quest management to the quest log would have orphaned them, so they are placed on WIKI-13 for lane 6.

1,623 rows on 103 surfaces. Feedback-site tests: 95 passed.

🤖 Generated with Claude Code

Part of #659, following the owner's review of lane 5. ## D41 adopted The planning page becomes **PREP-4, "Planning, for the whole campaign"**, with IS-346 to IS-354. It has its own place in the Contents. ## The coverage check The owner asked whether every feature made it onto the page. Every row the catalogue places on PREP-1 to PREP-3 was classified against the page by a script that asserts none is skipped: | Status | Placements | |---|---| | Drawn | 86 | | Replaced by a decision, replacement drawn | 39 | | Behaviour, nothing to draw | 9 | | Another lane's surface | 6 | | Deferred (speculative) | 2 | | **Dropped without a word** | **68** | Total: 211 placements. All 68 are drawn now: - **Tools with their results:** read-aloud, random tables, loot parcels, voice cues and the arc suggester. - **Where a result goes:** Save to the wiki, Append to an article (as a draft to review), and Copy. - **Foundry:** the split button and its push states. - **Busy, failed and empty states:** for the plan, the tools, the page and history. - **Arcs:** editing and deleting them. - **Suggest a title:** the first-of-series state. The first draw showed suggestions for Session 14, which is the first of its series and so has nothing to suggest from. ## Rows re-homed so they aren't dropped twice - The Arc Board rows move to PREP-4, where the arcs now live. - Seven quest-tracker rows were placed only on PREP-2. Moving quest management to the quest log would have orphaned them, so they are placed on WIKI-13 for lane 6. 1,623 rows on 103 surfaces. Feedback-site tests: 95 passed. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
The owner adopted the planning page on review. It becomes PREP-4,
"Planning, for the whole campaign", with IS-346 to IS-354 for what it
holds.

A coverage check of lane 5 found rows the decisions would have orphaned:
- The Arc Board rows (PR-019, PR-047 to PR-058) move to PREP-4, where
  the arcs now live.
- Seven quest-tracker rows were placed only on PREP-2 (PR-071, 072,
  074, 076, 077, 078, 080). Moving quest management to the quest log
  would have dropped them, so they, and the rest of the tracker's rows,
  are placed on WIKI-13 for lane 6.

1,623 rows on 103 surfaces.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
feat(feedback-site): lane 5 draws the 68 features it had dropped (#659)
All checks were successful
CI / Docker image build (pull_request) Successful in 34s
CI / Bot/backend version sync (pull_request) Successful in 53s
CI / Summarisation accuracy eval harness (stub provider) (pull_request) Successful in 55s
CI / Backend lint (ruff) (pull_request) Successful in 59s
CI / Feedback site tests (pull_request) Successful in 1m11s
CI / Bot tests and audit (pull_request) Successful in 1m49s
CI / Frontend tests, audit, and build (pull_request) Successful in 2m17s
CI / Backend migration, tests, and audit (pull_request) Successful in 8m17s
CI / Synthetic session harness (no GPU, no LLM) (pull_request) Successful in 17m29s
3e37c69d3b
After review, every row the catalogue places on the Prep surfaces (211
placements) was checked against the page. 68 had been dropped silently.
They are drawn now:

- Read-aloud, random tables, loot parcels, voice cues and the arc
  suggester, with their inputs and results; a roll table is a table.
- Where a result goes: Save to the wiki, Append to an article (a draft
  to review), Copy, on every tool.
- Foundry: a plain button before the session, the split button during
  it, sending/sent/not sent with the reason, and Push the update.
- Busy, failed, empty: the plan failing, a tool failing or busy, no NPC
  ready, names not ready, the page loading, history empty or broken, a
  run still going.
- Arcs edited, deleted with an undo, suggested and empty, on PREP-4.
- Suggest a title fixed: Session 14 opens its series, so it has nothing
  to suggest from; Session 15 is drawn with suggestions.

D41 is marked adopted throughout, and Planning is in the Contents on
every still.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Author
Collaborator

Merged to main as 879b98e on green CI (run 9960) and deployed to the review site. Feedback data was backed up first; the container is healthy and all 6 responses are intact.

Merged to main as 879b98e on green CI (run 9960) and deployed to the review site. Feedback data was backed up first; the container is healthy and all 6 responses are intact.
claude-bot closed this pull request 2026-09-18 17:50:51 +00:00
All checks were successful
CI / Docker image build (pull_request) Successful in 34s
Required
Details
CI / Bot/backend version sync (pull_request) Successful in 53s
Required
Details
CI / Summarisation accuracy eval harness (stub provider) (pull_request) Successful in 55s
Required
Details
CI / Backend lint (ruff) (pull_request) Successful in 59s
Required
Details
CI / Feedback site tests (pull_request) Successful in 1m11s
Required
Details
CI / Bot tests and audit (pull_request) Successful in 1m49s
Required
Details
CI / Frontend tests, audit, and build (pull_request) Successful in 2m17s
Required
Details
CI / Backend migration, tests, and audit (pull_request) Successful in 8m17s
Required
Details
CI / Synthetic session harness (no GPU, no LLM) (pull_request) Successful in 17m29s
Required
Details

Pull request closed

Sign in to join this conversation.
No description provided.